
| Parameter | Straw panel house | Traditional house (brick/concrete) |
|---|---|---|
| Construction time | 3-5 months | 12-24 months |
| Heating costs | up to 15 kWh/m² per year | 100-120 kWh/m² per year |
| Thermal insulation | Very high | Average |
| Sound insulation | up to 56 dB | Lower |
| Ecology | 100% natural materials | Industrial materials |
| Fire resistance | REI 60 (up to 1000°C) | High |
| Wall assembly speed | 3-10 days | Several weeks |
| Execution precision | Factory production | Depends on the contractor |
| Indoor climate | Natural humidity regulation | No natural regulation |